logo

Hangingstone SAGD Project, Alberta

Sector: Oil and Gas • Location: Canada

Source: Hydrocarbon Technology

Project
Closed

Athabasca’s Hangingstone Project is an oil sands steam-assisted gravity drainage (SAGD) project developed about 20km south-west of Fort McMurray in Alberta, Canada. The project was implemented with a $536m investment and an additional $27m for the construction of ancillary infrastructure. It has a production capacity of 12,000 barrels a day, while two proposed additional phases are expected to in

Project Information FAQ

Project Information

3 Q
The project “Hangingstone SAGD Project, Alberta” is an infrastructure initiative in the Oil and Gas sector, located in Canada. Taiyo aggregates data on it from Hydrocarbon Technology.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Athabasca’s Hangingstone Project is an oil sands steam-assisted gravity drainage (SAGD) project developed about 20km south-west of Fort McMurray in Alberta, Canada. The project was implemented with a $536m investment and an additional $27m for the construction of ancillary infrastructure. It has a production capacity of 12,000 barrels a day, while two proposed additional phases are expected to increase capacity to more than 80,000 barrels a day. The project area is made up of 213 sections of land covering an area of about 136,000 acres of oil sands leases. The field is estimated to hold 51 million barrels of proven reserves, 66 million barrels of probable reserves and 912 million barrels of contingent resources (best estimate). The SAGD process is implemented for production as Athabasca does not do surface mining. The innovative SAGD process is an advanced form of steam stimulation in which a pair of horizontal wells measuring approximately 800m is drilled into the oil reservoir. The vertical distance between the two horizontal wells is about five metres, and each well pair is spaced at 100m. Steam is injected into the upper well on a continuous basis to heat the oil and reduce its viscosity. The heated oil then drains into the lower well and flows to the surface, along with the warm water. The water required to generate the steam for SAGD operations is sourced from local subsurface aquifers. The front-end engineering and design (FEED) study for the current SAGD project in Alberta was completed in early 2012. The project is being implemented in three phases. The regulatory approval for the first phase was obtained in October 2012 and the budget was sanctioned in November 2012. The drilling of the well pairs commenced in August 2013. Initial injection of steam for the first phase was completed in 2014. The first production of bitumen was achieved in July 2015. Phase one involved the construction of a central processing facility (CPF), including four well pads comprising five well pairs each. Other ancillary project activities included the construction of connecting pipelines and roads. The company employed two SAGD drilling rigs and one SAGD completion rig, boilers, evaporators and pumps. The regulatory application for the next two phases was submitted in May 2013. The two subsequent phases are expected to be developed at 40,000 and 30,000 barrels a day capacities respectively. Bitumen from the field is conveyed via a pipeline to Enbridge’s Cheecham Terminal. The pipeline measures 45km in length and 16 inches in diameter. The current project is the ninth oil sands project to be connected to Enbridge’s regional system. Following regulatory and environmental approvals, right-of-way clearing started in early 2014. Enbridge has been contracted to construct the pipeline and facilities, as well as provide the terminal services for the project. The investment for the construction of the pipeline and facilities is $200m. GE has been contracted to provide its evaporation technology for the project. GE’s water treatment system is designed to recover 98% of the produced water and brackish water used as boiler feedwater to drive the SAGD process. The Athabasca Oil Sands Project is the latest fully integrated oil sands development in 25 years. The Fort Hills project is an integrated oil sands project that includes a mine (approved in 2002 by Alberta Environment and the Alberta Energy and Utilities Board) and bitumen extraction facility, situated 90 miles north of Fort McMurray in Alberta (Athabasca oil sands region), Canada.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data