logo
ProjectGc Bidding

Hankins Pump Station 2

Sector: Water Supply and Storage • Location: Twin Falls, Idaho, United States of America

Source: Dodge USA

The Project generally includes the construction of a new potable water booster pump station with two 50-hp vertical turbine canned pumps, two 150-hp vertical turbine canned pumps, mechanical piping and valves, electrical system, instrumentation and controls, HVAC system, a CMU block building with metal roof, 30- and 36-inch yard piping, site civil work and grading, site electrical, rock excavation

Status
Under Construction
Sector
Water Supply and Storage, Metal, Wind, Commercial, Power Generation (CCGT), Government, Car parking, Waste Processing and Treatment, Automotive
Location
Twin Falls, Idaho, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Hankins Pump Station 2

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Hankins Pump Station 2” is an infrastructure initiative in the Water Supply and Storage sector, located in Twin Falls, Idaho, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

GC Bidding

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Project generally includes the construction of a new potable water booster pump station with two 50-hp vertical turbine canned pumps, two 150-hp vertical turbine canned pumps, mechanical piping and valves, electrical system, instrumentation and controls, HVAC system, a CMU block building with metal roof, 30- and 36-inch yard piping, site civil work and grading, site electrical, rock excavation, gravel parking areas, and a back-up generator.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Idaho

City

Twin Falls

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Metal, Wind, Commercial, Power Generation (CCGT), Government, Car parking, Waste Processing and Treatment, Automotive

Article published date

2024-11-04

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project