Hanna Region Transmission Development, Alberta, Canada
Sector: Commercial • Location: Canada
Source: Bechtel
Hanna Region Transmission Development,Delivering energy and protecting the environment
The Hanna Region Transmission Development project in Alberta, completed for ATCO Electric by Bechtel, was extensive. Nearly 220 miles (354 kilometers) of new transmission lines were constructed, which included 153 miles (246 kilometers) of 240-kilovolt lines and lattice structures (both single and double circui
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Close |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Hanna Region Transmission Development,Delivering energy and protecting the environment The Hanna Region Transmission Development project in Alberta, completed for ATCO Electric by Bechtel, was extensive. Nearly 220 miles (354 kilometers) of new transmission lines were constructed, which included 153 miles (246 kilometers) of 240-kilovolt lines and lattice structures (both single and double circuit); 69 miles (111 kilometers) of new 144-kilovolt transmission lines, wood pole, lattice tower, and steel monopole structures (both single and double circuit); six new substations and modifications to 12 existing substations. The project has helped us meet the increased demand for electricity in the Hanna region due to industrial growth in the area.Sett Policicchio, president, ATCO Electric Transmission Division. Image gallery Bechtel’s value is really the process they bring to the project―from cost estimating to scheduling, to managing the people and managing the project.Quyen Nguyen. vice president, high-voltage direct current projects, ATCO Electric’s Transmission Division About the project We provided ATCO project management, procurement management, construction management, contracts management, and environmental, safety, and health management services from contract formation through construction, commissioning, and closeout. Bechtel used time-tested project management tools coupled with a sophisticated geographic information system (GIS) to help manage risk, automate processes, and comply with historical and environmental guidelines. The project team: Completed the project on time and under budget Helped the customer meet forecasted load growth (demand expected to double in the province by 2017) Used innovative mobile technologies to manage environmental requirements, guide right-of-way layout, and automate processes―saving both time and money Innovations to manage environmental concerns About 60 percent of the area where the project was built passed through protected pasture, native grasses, and wetlands that are also wildlife breeding grounds. To minimize the impact to the sensitive areas, the project team used a mobile app to ensure that the field team had customized information about accessing land parcels and environmental regulations. We had automated checklists built into the mobile app, which allowed us to conduct environmental and safety checks while we continued to monitor the project for quality compliance. The automation and integration of the information across the project meant fewer trips back to the office for field personnel and more time in the field focusing on executing the work. We also had special GIS handheld devices that allowed workers to easily see the boundaries of the environmentally-sensitive areas and make decisions about next steps right in the field. Despite working miles apart, the Bechtel and ATCO Electric team worked in unison to develop innovative and sustainable solutions that ensured the safe delivery of the project with minimal environmental impact. We undertook extensive measures to minimize environmental impacts on soil and wetlands, and to protect wildlife habitats. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | Medium |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |