Hanna St Trail East Wallace St to East Berry St Renovation
Sector: Water Supply and Storage • Location: Fort Wayne, Indiana, United States of America
Source: Dodge
Renovating the Hanna Street corridor by installing a new 8' wide concrete trail along the east side of Hanna Street from E. Wallace Street to E. Berry Street. This will enhance connectivity for the residents of the East Central neighborhoods. Concrete drive and alley approaches and new ADA curb ramps along with upgraded storm sewer infrastructure is included. Connecting sidewalk segments and new c
- Status
- Closed
- Sector
- Water Supply and Storage, Mass Transit, Government, Car parking, Road, Consumer Products, Cement, Rail, Waste Processing and Treatment, Automotive, Commercial
- Location
- Fort Wayne, Indiana, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Hanna St Trail East Wallace St to East Berry St Renovation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Renovating the Hanna Street corridor by installing a new 8' wide concrete trail along the east side of Hanna Street from E. Wallace Street to E. Berry Street. This will enhance connectivity for the residents of the East Central neighborhoods. Concrete drive and alley approaches and new ADA curb ramps along with upgraded storm sewer infrastructure is included. Connecting sidewalk segments and new concrete curbing is included as well. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Indiana |
City | Fort Wayne |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Mass Transit, Government, Car parking, Road, Consumer Products, Cement, Rail, Waste Processing and Treatment, Automotive, Commercial |
Article published date | 2025-07-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
