Hanson Property Development Infrastructure - Phase 1
Sector: Water Supply and Storage • Location: Viroqua, Wisconsin, United States of America
Source: Dodge
The project includes street and infrastructure improvements for a residential development within the City. The construction includes stripping and stockpiling topsoil, common excavation, grading, base course, sanitary sewer, storm sewer, water main, curb and gutter, asphalt paving, restoration of the work area, and other miscellaneous items in conformance with the Contract Documents.
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Road, Residential, Waste Processing and Treatment, Commercial, Car parking, Automotive
- Location
- Viroqua, Wisconsin, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Hanson Property Development Infrastructure - Phase 1
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project includes street and infrastructure improvements for a residential development within the City. The construction includes stripping and stockpiling topsoil, common excavation, grading, base course, sanitary sewer, storm sewer, water main, curb and gutter, asphalt paving, restoration of the work area, and other miscellaneous items in conformance with the Contract Documents. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Wisconsin |
City | Viroqua |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Road, Residential, Waste Processing and Treatment, Commercial, Car parking, Automotive |
Article published date | 2025-09-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
