Hanson Solar Facility
Pre-design · Texas · Last reported Mar 2025
Source: Dodge
A 505MWdc (396MWac) solar facility to be owned and operated by Cypress Creek Renewables in Coleman County, Texas. The project will deliver electricity to the ERCOT grid, supporting Meta's clean energy commitments. It's expected to provide over $80 million in local tax revenue and create more than 300 construction jobs.
- Status
- Prospective
- Sector
- Power Generation (CCGT), Commercial, Solar
- Location
- Texas, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Hanson Solar Facility
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | A 505MWdc (396MWac) solar facility to be owned and operated by Cypress Creek Renewables in Coleman County, Texas. The project will deliver electricity to the ERCOT grid, supporting Meta's clean energy commitments. It's expected to provide over $80 million in local tax revenue and create more than 300 construction jobs. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Commercial, Solar |
Article published date | 2025-03-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 77 @ FALLING CREEK 6.1 MI S OF ELBERTON
- VALDOSTA - AIRFIELD ELECTRICAL IMPROVEMENTS
- CR 423/MOUNT OLIVE ROAD @ SANDY CREEK NW OF DUBLIN
- DISTWIDE STUDY REMOVAL/RELOCATION OF UTILITY POLES DIST 3
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
