Hanwha Ocean FPSO P-79 Project
The owner, status and timeline of this project. A free account opens every field.
Source: economy.ac
Hanwha Ocean is constructing the FPSO P-79 offshore facility for Petrobras, valued at $2.3 billion, scheduled for delivery in 2026. The project involves design, engineering, and deepwater operating technologies for offshore crude oil production and storage.
- Status
- Under Construction
- Sector
- Oil and Gas
- Location
- Brazil
- Updated
- 22 Jul 2026
- Source
- economy.ac
ConstructChat
Ask ConstructChat about Hanwha Ocean FPSO P-79 Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Hanwha Ocean is constructing the FPSO P-79 offshore facility for Petrobras, valued at $2.3 billion, scheduled for delivery in 2026. The project involves design, engineering, and deepwater operating technologies for offshore crude oil production and storage. |
Original sector | Shipbuilding |
Budget |
Location
Country | Brazil |
Source
Source | economy.ac |
URL |
More Details
Record type | Project |
Sector | Oil and Gas |
Article published date | 2026-05-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
