logo

HAPEVILLE STREETSCAPE ENHANCEMENTS @ 5 LOCS

Sector: Road • Location: Hapeville, Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Complete

Hapeville Streetscape Enhancements: 1. CS 8059/North Fulton Ave from SR 3/North Central Ave to CS 8078/King Arnold Street 2. Service Ally from CS 8059/North Fulton Ave to Dearborn Plaza 3. CS 8076/Claire Drive from CS 8078/King Arnold to CS CS 8074/Meadow Drive 4. CS 8078/King Arnold Street from CS 8059/North Fulton Ave to CS 8076/Claire Drive 5. CS 8084/Scout Street from CS 8076/Claire Drive to C

Project Information FAQ

Project Information

4 Q
The project “HAPEVILLE STREETSCAPE ENHANCEMENTS @ 5 LOCS” is an infrastructure initiative in the Road sector, located in Hapeville, Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

complete

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Hapeville Streetscape Enhancements: 1. CS 8059/North Fulton Ave from SR 3/North Central Ave to CS 8078/King Arnold Street 2. Service Ally from CS 8059/North Fulton Ave to Dearborn Plaza 3. CS 8076/Claire Drive from CS 8078/King Arnold to CS CS 8074/Meadow Drive 4. CS 8078/King Arnold Street from CS 8059/North Fulton Ave to CS 8076/Claire Drive 5. CS 8084/Scout Street from CS 8076/Claire Drive to CS 8067/Parkway Drive Project constructs improvements along both sides for 400 linear feet of North Fulton Avenue. Improvements include new curb and gutter, sidewalk, ADA ramps, landscaping, pavers, crosswalks, pedestrian lights, benches and trash receptacles. Installation of curb and gutter necessitates resurfacing a portion of the street. Five on-street parking spaces will be eliminated. There will be improvements to the plaza and alley adjacent to North Fulton Avenue including paves, landscaping, benches, a fountain, decorative columns and relocation of existing City owned monuments.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data