Happy Valley Road Improvements 67th Ave to 35th Ave
Sector: Water Supply and Storage • Location: Phoenix, Arizona, United States of America
Source: Dodge USA
Happy Valley Road will be upgraded to include three through lanes and one buffered bike lane in each direction with raised median islands. The proposed improvements include roadway widening, installation of Americans with Disability Act sidewalk and curb ramps, scenic trails, raised medians, new bus bays, pads and stops, drainage improvements, new street lighting, upgrading traffic signals, mill a
- Status
- Closed
- Sector
- Water Supply and Storage, Commercial, Road, Government, Car parking, Waste Processing and Treatment, Automotive, Manufacturing (Industrial)
- Location
- Phoenix, Arizona, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Happy Valley Road Improvements 67th Ave to 35th Ave
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Happy Valley Road will be upgraded to include three through lanes and one buffered bike lane in each direction with raised median islands. The proposed improvements include roadway widening, installation of Americans with Disability Act sidewalk and curb ramps, scenic trails, raised medians, new bus bays, pads and stops, drainage improvements, new street lighting, upgrading traffic signals, mill and overlay, new striping and signage, and landscaping. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Arizona |
City | Phoenix |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Road, Government, Car parking, Waste Processing and Treatment, Automotive, Manufacturing (Industrial) |
Article published date | 2024-11-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
