Harbard Close Housing / Reed Watts Architects
The status, timeline and source of this project. A free account opens every field.
Source: ArchDaily
Working with the brick slip manufacturer Reed Watts developed a color palette to connect to the warm terracotta and buff tones of neighboring buildings. The subtle changes in color across the façade helps to break up the massing and to create a sense of ‘texture’ even though the façade itself is relatively sheer. In contrast to the solidity of the elevations, the stair cores are light, airy spaces
- Status
- Closed
- Sector
- Road, Car parking, Residential, Steel, Metal, Commercial, Warehouse, Automotive
- Updated
- 22 Jul 2026
- Source
- ArchDaily
ConstructChat
Ask ConstructChat about Harbard Close Housing / Reed Watts Architects
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Working with the brick slip manufacturer Reed Watts developed a color palette to connect to the warm terracotta and buff tones of neighboring buildings. The subtle changes in color across the façade helps to break up the massing and to create a sense of ‘texture’ even though the façade itself is relatively sheer. In contrast to the solidity of the elevations, the stair cores are light, airy spaces. By creating openings within the cast-glass cladding, residents have a direct visual connection to the gardens with panoramic views acrossLondonfrom the higher levels.The site had previously been home to a series of prefabricated houses built as part of the progressive, post-war, temporary homes program. These were demolished in the 1970s leaving an isolated parcel of land without a real purpose or focus. While not part of the original brief, Reed Watts felt that it was important to re-establish connections across the site, allowing people to move through it once more. The resulting masterplan introduced a new pedestrian route that defined space for shared gardens, public open space, and a small number of parking spaces for disabled residents.Each of the blocks is accessed through its own walled garden. These spaces include meadow planting in place of formal lawns as well as areas for residents to socialize together with dedicated seating areas and raised allotment beds. In addition to these external spaces, a shared garden room is provided within the buildings where residents can come together for events, group workshops, and as an alternative to their own living rooms if working from home.Text description provided by the architects.Arranged in two blocks with expressed vertical circulation, the scheme creates a dramatic new edge to Barking town center marking the transition from the established residential neighborhood to the east to the more open landscape of the River Roding to the west.While the form and massing of the buildings were established quite early in the project, the construction methods and façade materials evolved during the process. Initially planned as a fully pre-fabricated scheme, the design developed to use light-gauge steel frame panels while the façade evolved to include an insulated render with brick slips. The changes required close collaboration between the design team, planners, contractors, and clients.The scheme provides 78 one-bedroom homes, including two wheelchair-adaptable homes. It represents Reed Watts’s largest project to date and it is fully occupied by local first-time buyers.The four and six-storey blocks sit to the north and south of this new route respectively, with the northern block sitting at 90 degrees to the other. This arrangement creates closure to the landscaped gardens and helps to reduce the impact of the development on neighboring properties. |
Location
| Not available for this record. |
Source
Source | ArchDaily |
URL |
More Details
Record type | Project |
Sector | Road, Car parking, Residential, Steel, Metal, Commercial, Warehouse, Automotive |
Article published date | 2025-06-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects
- Auburn Avenue Historic and Cultural Information Project
- M.L. King Jr. Dr. Cycle Track
- KING STREET IN COHUTTA
- SR 120/ROSWELL RD@CR 4662/EAST COBB DR EXT LT TURN LANE
- DISTRICTWIDE PAVEMENT MARKING DIST 7
- EPHESUS CHURCH ROAD BR.& APPR.@ DOG RIVR(097-02278-00105E)
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 109 FROM ALABAMA STATE LINE TO SR 14/US 29
