Harbor Bridge Replacement Project
One of 10,000+ projects Taiyo tracks in Texas.
Source: SA Instrumentation & Control
The project involved the removal of the centre span of the historic 1959 US 181 Harbor Bridge and its replacement with a modern cable-stayed structure designed to improve safety and better serve maritime traffic, roadway users, pedestrians, and the surrounding community. The removal was executed using a lift-and-lower method to safely remove the 2300 ton centre span in one piece and place it onto
- Status
- Closed
- Sector
- Seaport, Bridge
- Location
- Corpus Christi, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- SA Instrumentation & Control
ConstructChat
Ask ConstructChat about Harbor Bridge Replacement Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project involved the removal of the centre span of the historic 1959 US 181 Harbor Bridge and its replacement with a modern cable-stayed structure designed to improve safety and better serve maritime traffic, roadway users, pedestrians, and the surrounding community. The removal was executed using a lift-and-lower method to safely remove the 2300 ton centre span in one piece and place it onto a barge. |
Original sector | Transportation |
Location
Country | United States of America (USA) |
State | Texas |
City | Corpus Christi |
Source
Source | SA Instrumentation & Control |
URL |
More Details
Record type | Project |
Sector | Seaport, Bridge |
Article published date | 2026-07-12 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
