Harbor Field Upgrades
Sector: Commercial • Location: Mandeville, Louisiana, United States of America
Source: Dodge USA
The work of this contract consists of 1. Removal of existing backstop, fencing, dugouts, bleachers and other improvements in the work area, 2. Installation of new backstop, scoring booth, dugouts, and bleachers, 3. Construction of a new Dry Floodproofed building for Concessions & Restrooms, 4. Installation of new pavements, new infield, new field lighting, and fences with gates, 5. New site utilit
- Status
- Closed
- Sector
- Commercial, Water Supply and Storage, Power Transmission, Seaport, Stadium, Waste Processing and Treatment, Road, Power Generation (CCGT), Government
- Location
- Mandeville, Louisiana, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Harbor Field Upgrades
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work of this contract consists of 1. Removal of existing backstop, fencing, dugouts, bleachers and other improvements in the work area, 2. Installation of new backstop, scoring booth, dugouts, and bleachers, 3. Construction of a new Dry Floodproofed building for Concessions & Restrooms, 4. Installation of new pavements, new infield, new field lighting, and fences with gates, 5. New site utilities, water, sanitary sewer, and electrical services, 6. Installation of chain-link backstop, spor... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Louisiana |
City | Mandeville |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Water Supply and Storage, Power Transmission, Seaport, Stadium, Waste Processing and Treatment, Road, Power Generation (CCGT), Government |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in United States of America
- SR 3/US 19 FROM 0.14 MI S OF SR 7 TO HENRY COUNTY LINE
- SR 150 FROM 0.18 MI S OF CR 14/STERLING WELLS ROAD TO SR 47
- SR 61 FM PAULDING COUNTY LINE TO N OF CR 522/OLD ALABAMA RD
- COMMERCIAL DRIVE IN STATHAM
- SR 21 FROM 0.02 MI S OF SR 30 TO 0.24 MI S OF NS 916917C
- SR 155 FROM JONESBORO ROAD TO DEKALB COUNTY LINE
- SR 400 @ CR 9284/WINDWARD PKWY
- SR 49 FROM BIBB COUNTY LINE TO BALDWIN COUNTY LINE
