Harbor Freight Tools (Biloxi,MS)
Sector: Water Supply and Storage • Location: Biloxi, Mississippi, United States of America
Source: Dodge USA
Demolition: Interior & exterior Paving & Striping: asphalt patching & re-stripe parking lot, seal coat Concrete: site concrete, slab repairs, plumbing trench in-fill Masonry: door openings, in-fills Siding: new metal soffit @ storefront canopy Steel: lintels, bollards, channels at overhead door, RTU frames, railings Drywall: frame, drywall, acoustical & FRP Roofing: Mechanical penetrations Glass &
- Status
- Closed
- Sector
- Water Supply and Storage, Commercial, Road, Rail, Steel, Metal, Cement, Car parking, Seaport, Automotive
- Location
- Biloxi, Mississippi, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Harbor Freight Tools (Biloxi,MS)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Demolition: Interior & exterior Paving & Striping: asphalt patching & re-stripe parking lot, seal coat Concrete: site concrete, slab repairs, plumbing trench in-fill Masonry: door openings, in-fills Siding: new metal soffit @ storefront canopy Steel: lintels, bollards, channels at overhead door, RTU frames, railings Drywall: frame, drywall, acoustical & FRP Roofing: Mechanical penetrations Glass & Glazing Flooring: install owner furnished carpet, LVT & base (NO POLISHED CONCRETE) Paint: Inter... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Mississippi |
City | Biloxi |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Road, Rail, Steel, Metal, Cement, Car parking, Seaport, Automotive |
Article published date | 2024-09-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
