Harbor Freight Tools Miami FL
Sector: Water Supply and Storage • Location: Miami, Florida, United States of America
Source: Dodge USA
Interior alterations in an existing stand alone mercantile building, including; new offices and restrooms. Exterior alterations; including new bi-parting door system at main entry and a new hollow metal egress doors from the sales area. A new 3,367 s.F. Stock and receiving addition shall be constructed, including a new 8'-0" x 10'-0" overhead coiling door, egress door from the receiving area, brea
- Status
- Closed
- Sector
- Water Supply and Storage, Commercial, Metal, Cement, Car parking, Seaport, Residential, Manufacturing (Industrial), Automotive
- Location
- Miami, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Harbor Freight Tools Miami FL
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Interior alterations in an existing stand alone mercantile building, including; new offices and restrooms. Exterior alterations; including new bi-parting door system at main entry and a new hollow metal egress doors from the sales area. A new 3,367 s.F. Stock and receiving addition shall be constructed, including a new 8'-0" x 10'-0" overhead coiling door, egress door from the receiving area, break room and a new 20' x 20' concrete receiving pad. The existing parking area shall be re-striped. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Miami |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Metal, Cement, Car parking, Seaport, Residential, Manufacturing (Industrial), Automotive |
Article published date | 2024-09-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
