Harbour Pump Station Header Replacement
Sector: Steel • Location: Vancouver, British Columbia, Canada
Source: Dodge USA
The work includes temporary internal and external bypassing, removal and disposal of existing piping and valves and other equipment, fabrication and installation of a new steel header pipe and valves, structural work, all in and around a live operating sewage pump station
- Status
- Under Construction
- Sector
- Steel, Waste Processing and Treatment, Seaport, Manufacturing (Industrial), Government, Metal, Commercial, Water Supply and Storage
- Location
- Vancouver, British Columbia, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Harbour Pump Station Header Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Start |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work includes temporary internal and external bypassing, removal and disposal of existing piping and valves and other equipment, fabrication and installation of a new steel header pipe and valves, structural work, all in and around a live operating sewage pump station |
Procurement method | |
Budget |
Location
Country | Canada |
State | British Columbia |
City | Vancouver |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Steel, Waste Processing and Treatment, Seaport, Manufacturing (Industrial), Government, Metal, Commercial, Water Supply and Storage |
Article published date | 2024-08-12 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
