logo

Hardy Dam Spillway Replacement

Sector: Hydro • Location: Newaygo, Michigan, United States

Source: Bridge Michigan

Project
Planned

Consumers Energy plans a $350 million replacement of the spillway at Hardy Dam on the Muskegon River to bring the 95-year-old dam into compliance with federal flood control standards. The project aims to upgrade the dam to pass the probable maximum flood, the largest flood possible for the area. Construction was initially planned to start in 2023, then moved to 2025, and now Consumers Energy seeks

Status
Prospective
Sector
Hydro, Road, Bridge
Location
Newaygo, Michigan, United States of America
Updated
22 Jul 2026
Source
Bridge Michigan

ConstructChat

Ask ConstructChat about Hardy Dam Spillway Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Hardy Dam Spillway Replacement” is an infrastructure initiative in the Hydro sector, located in Newaygo, Michigan, United States. Taiyo aggregates data on it from Bridge Michigan.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Consumers Energy plans a $350 million replacement of the spillway at Hardy Dam on the Muskegon River to bring the 95-year-old dam into compliance with federal flood control standards. The project aims to upgrade the dam to pass the probable maximum flood, the largest flood possible for the area. Construction was initially planned to start in 2023, then moved to 2025, and now Consumers Energy seeks to delay the start to December 31, 2028, citing regulatory holdups and a pending sale of the dam to a private equity firm.

Original sector

Energy

Budget

Location

Country

United States of America (USA)

State

Michigan

City

Newaygo

Source

Source

Bridge Michigan

URL

More Details

Record type

Project

Sector

Hydro, Road, Bridge

Article published date

2026-03-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project