Harmony Hills Bridge Replacement
One of 10,000+ projects Taiyo tracks in Missouri.
Source: Dodge
The proposed work includes replacing the existing bridge on Harmony Hills Drive in Harmony Hills Manor, a private development with publicly maintained streets. The current bridge is structurally deficient and will be replaced with a new bridge consisting of four concrete spread box beams. The new bridge will be wider than the previous structure and will be protected with rock blankets to prevent f
- Status
- Closed
- Sector
- Cement, Road, Government, Bridge, Commercial
- Location
- Hillsboro, Missouri, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Harmony Hills Bridge Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed work includes replacing the existing bridge on Harmony Hills Drive in Harmony Hills Manor, a private development with publicly maintained streets. The current bridge is structurally deficient and will be replaced with a new bridge consisting of four concrete spread box beams. The new bridge will be wider than the previous structure and will be protected with rock blankets to prevent further erosion. The limits of the project are from Vogel Road until the intersection of Harmony H... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Missouri |
City | Hillsboro |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Cement, Road, Government, Bridge, Commercial |
Article published date | 2025-07-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Cement projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- SR 83 @ SHOAL CREEK
- OPERATE CONCRETE RECYCLING FACILITY UNTIL PERMANANT FACILITY IS APPROVED AND OPERATIONAL ON DEPOT ROAD
- REMOVE TILE ROOF & INSTALL OSB & (N) 30 LB FELT PAPER & NEW CONCRETE TILES (9 LB/SF), COLOR: APPALATIAN BLEND
- SWIMMING POOL REMODEL. UPGRADE PLUMBING, REPLACE CONCRETE, REPAIR POOL FENCING
- (N)WASHING SYSTM & EQUIPMT,REFRIGERATION UNIT,EXHAUST FAN & DUCTING,CONCRETE PAD,(N)HOPPER & INCLINE CONVEYOR,FIRE WALL
- Inova Women's Hospital & Children's Hospital
