Harmony Link Electricity Interconnector
Planned · Poland, Lithuania · Last reported May 2026
Source: European Climate, Infrastructure and Environment Executive Agency
The Harmony Link is a future electricity interconnector project between Poland and Lithuania that will enable electricity exchanges between the two countries and strengthen the integration of the Baltic electricity systems with the Continental European network.
- Status
- Prospective
- Sector
- Power Generation (CCGT)
- Location
- Poland
- Updated
- 22 Jul 2026
- Source
- European Climate, Infrastructure and Environment Executive Agency
ConstructChat
Ask ConstructChat about Harmony Link Electricity Interconnector
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Harmony Link is a future electricity interconnector project between Poland and Lithuania that will enable electricity exchanges between the two countries and strengthen the integration of the Baltic electricity systems with the Continental European network. |
Original sector | Energy |
Location
Country | Poland |
Source
Source | European Climate, Infrastructure and Environment Executive Agency |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT) |
Article published date | 2026-05-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
