Harmony Ridge Townhomes Infrastructure Development
Sector: Road • Location: Charlotte, North Carolina, United States of America
Source: Dodge
Horizontal infrastructure for an 8-unit townhome community in north Charlotte near the N. Tryon and Sugar Creek Road corridor. The project includes grading, utilities, storm drainage infrastructure, paving, sidewalks and other horizontal site infrastructure work. The total project cost is approximately $2 million including both the horizontal and the vertical construction of 8 townhome units. The
- Status
- Closed
- Sector
- Road, Residential, Power Transmission, Manufacturing (Industrial), Commercial, Power Generation (CCGT), Car parking, Automotive, Waste Processing and Treatment
- Location
- Charlotte, North Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Harmony Ridge Townhomes Infrastructure Development
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Horizontal infrastructure for an 8-unit townhome community in north Charlotte near the N. Tryon and Sugar Creek Road corridor. The project includes grading, utilities, storm drainage infrastructure, paving, sidewalks and other horizontal site infrastructure work. The total project cost is approximately $2 million including both the horizontal and the vertical construction of 8 townhome units. The remaining funds will come from Habitat for Humanity of the Charlotte Region |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | North Carolina |
City | Charlotte |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Road, Residential, Power Transmission, Manufacturing (Industrial), Commercial, Power Generation (CCGT), Car parking, Automotive, Waste Processing and Treatment |
Article published date | 2025-09-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in United States of America
- KING STREET IN COHUTTA
- SR 120/ROSWELL RD@CR 4662/EAST COBB DR EXT LT TURN LANE
- DISTRICTWIDE PAVEMENT MARKING DIST 7
- EPHESUS CHURCH ROAD BR.& APPR.@ DOG RIVR(097-02278-00105E)
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 109 FROM ALABAMA STATE LINE TO SR 14/US 29
- JASPER-DAHLONEGA ROAD
- MOULTRIE - SYLVESTER ROAD
