Harrietsfield Remediation Project
Sector: Other • Location: Nova Scotia, Canada
Source: Infrastructure Canada
Project consists of the removal of all existing site buildings; sorting and removal of site debris buried outside the landfill area; removal of sorting structures and infrastructure; address and correct the deficiencies of the existing landfill cell and recap it; disposal of onsite debris that cannot be recycled in the managed landfill/containment cell; redirection of surface and groundwater flow
- Status
- Closed
- Sector
- Other
- Location
- Nova Scotia, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Harrietsfield Remediation Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Project consists of the removal of all existing site buildings; sorting and removal of site debris buried outside the landfill area; removal of sorting structures and infrastructure; address and correct the deficiencies of the existing landfill cell and recap it; disposal of onsite debris that cannot be recycled in the managed landfill/containment cell; redirection of surface and groundwater flow around the landfill/containment cell; treatment of existing landfill leachate and ongoing long term management of potential leachate for 25 years |
Original sector | Other |
Location
Country | Canada |
State | Nova Scotia |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Article published date | 2026-05-31 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
