Harris Elementary School Fire Flow Improvements
One of 10,000+ projects Taiyo tracks in Georgia.
Source: Dodge USA
Project Description: Replacement of approximately 7,100 linear feet LF of existing water mains, including 6-inch cast iron pipe CIP and asbestos cement pipe ACP, with new 12-inch and 16-inch ductile iron pipe DIP along Duluth Highway State Route 120 and Claiborne Drive. The section along Duluth Highway will be 5,800 LF of 12-inch and 16-inch DIP. The section along Claiborne Drive will be 1,300 LF
- Status
- Prospective
- Sector
- Metal, Water Supply and Storage, Road, Government, Steel, Commercial
- Location
- Lawrenceville, Georgia, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Harris Elementary School Fire Flow Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Project Description: Replacement of approximately 7,100 linear feet LF of existing water mains, including 6-inch cast iron pipe CIP and asbestos cement pipe ACP, with new 12-inch and 16-inch ductile iron pipe DIP along Duluth Highway State Route 120 and Claiborne Drive. The section along Duluth Highway will be 5,800 LF of 12-inch and 16-inch DIP. The section along Claiborne Drive will be 1,300 LF of 12-inch DIP. Includes branch connections and tie-ins, abandoning existing parallel water mains... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Georgia |
City | Lawrenceville |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Metal, Water Supply and Storage, Road, Government, Steel, Commercial |
Article published date | 2024-03-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- NEW 3200 SF PREFAB METAL BUILDING CONSISTING OF A CUSTOMER INTERFACE, OFFICES, RESTROOM/BREAK ROOM, DISASSEMBLY & STOR.
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- REPLACE DAMAGED STEEL COLUMN
