Harrison High School Classroom Addition
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
The work includes, but is not limited to, the following: 1. Classroom addition to existing Harrison High School Building as shown on contract documents. 2. Demolition and removals as shown, 3. Site clearing, grubbing, sheeting, bracing, excavation, soil erosion protection, slope protection, earth movement, subgrade preparation, removal of excess and/or unsuitable excavated materials, dewatering, a
- Status
- Closed
- Sector
- Manufacturing (Industrial), Commercial, Education, Government
- Location
- Harrison, New York, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Harrison High School Classroom Addition
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work includes, but is not limited to, the following: 1. Classroom addition to existing Harrison High School Building as shown on contract documents. 2. Demolition and removals as shown, 3. Site clearing, grubbing, sheeting, bracing, excavation, soil erosion protection, slope protection, earth movement, subgrade preparation, removal of excess and/or unsuitable excavated materials, dewatering, and import of suitable material, as necessary to install and construct all work defined within the... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New York |
City | Harrison |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Commercial, Education, Government |
Article published date | 2025-03-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- SR 75 FROM SR 2 TO NORTH CAROLINA STATE LINE
- SR 20 FM PRESTON HILLS/LAUREL DR TO CR 715/REYNOLDS RD
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 10 FROM CR 107/NORTH LEG DRIVE TO CR 2485/HALE STREET
- CS 493/INDUSTRIAL BLVD FROM SR 19 TO SR 31 - TIA
- SR 19;SR 23; SR 26 & SR 204 @ 9 LOCS - BRIDGE PRESERVATION
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- West lake sammamish parkway phase 2
