Harrison Hot Springs - Fire Hall Renovation
Sector: Cement • Location: British Columbia, Canada
Source: Infrastructure Canada
The Village of Harrison Hot Springs (VHHS) will upgrade its Fire Hall (FH) in direct response to the COVID-19 pandemic distancing requirements and completing necessary seismic upgrades to retrofit this local government owned building. The single story addition will ensure the firefighters will have ample space to change into and out of their gear. The existing FH was constructed in 1992. Since the
- Status
- Closed
- Sector
- Cement, Commercial, Government
- Location
- British Columbia, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Harrison Hot Springs - Fire Hall Renovation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Village of Harrison Hot Springs (VHHS) will upgrade its Fire Hall (FH) in direct response to the COVID-19 pandemic distancing requirements and completing necessary seismic upgrades to retrofit this local government owned building. The single story addition will ensure the firefighters will have ample space to change into and out of their gear. The existing FH was constructed in 1992. Since then, seismic requirements found in the British Columbia (BC) Building Code have changed significantly. The Fire Department (FD), Village Council and Village management’s priority is to ensure the FH will be able to withstand a disaster such as an earthquake, forest fire, or flood, so that personnel would be able to respond to post-disaster recovery and emergency management efforts. In order to increase COVID-19 resiliency and meet these recommendations, the FD requires more space to accommodate a change room where they can don and doff their gear quickly while maintaining a safe distance from one another. This project will renovate the Village’s fire hall: - addition (504 sq ft / 46.8 sqm) one story addition - site Work - selective demolition - earthwork & concrete work - foundations and shear walls - URM (Unreinforced Masonry) Upgrade - exterior building envelope work - interior work - electrical/mechanical work; and, - all related works. |
Original sector | Community, Culture and Recreation |
Location
Country | Canada |
State | British Columbia |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Cement, Commercial, Government |
Article published date | 2025-07-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
