Harts Road Bridge Replacement
Pre-design · Florida · Last reported Jul 2025
Source: Dodge
This project is to improve approximately 1,200 linear feet of Harts Road including replacement of the bridge north of Bertha Street. This project is needed to improve the safety of pedestrians and vehicles as well as provide drainage improvements within the project limits.
- Status
- Prospective
- Sector
- Water Supply and Storage, Government, Bridge, Road, Commercial, Car parking, Automotive, Waste Processing and Treatment
- Location
- Jacksonville, Florida, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Harts Road Bridge Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | pre-design |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | This project is to improve approximately 1,200 linear feet of Harts Road including replacement of the bridge north of Bertha Street. This project is needed to improve the safety of pedestrians and vehicles as well as provide drainage improvements within the project limits. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Jacksonville |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Bridge, Road, Commercial, Car parking, Automotive, Waste Processing and Treatment |
Article published date | 2025-08-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
