Hartsfield Jackson Manifold Improvements

Sector: Airport • Location: Georgia, United States of America (USA)

Source: Atlanta Watershed

Project
Complete

Constructed in 1981, the Hartsfield-Jackson water distribution facility includes two below ground storage tanks and a re-pump station. The east and west concrete tanks are rectangular underground reservoirs and provide an estimated storage capacity of 5 million gallons each. These tanks receive water from the Hemphill Water Treatment Plant (WTP) and supply water to the Hartsfield-Jackson pump stat

Project Information FAQ

Project Information

5 Q
The project “Hartsfield Jackson Manifold Improvements” is an infrastructure initiative in the Airport sector, located in Georgia, United States of America (USA). Taiyo aggregates data on it from Atlanta Watershed.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

complete

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Constructed in 1981, the Hartsfield-Jackson water distribution facility includes two below ground storage tanks and a re-pump station. The east and west concrete tanks are rectangular underground reservoirs and provide an estimated storage capacity of 5 million gallons each. These tanks receive water from the Hemphill Water Treatment Plant (WTP) and supply water to the Hartsfield-Jackson pump station within the Hemphill service zone. The tanks serve the Hartfield-Jackson International Airport and Coweta County and can direct flow to South Fulton County during peak hours. The Hartsfield- Jackson re-pump station contains four pumps used to maintain pressure in the southern areas of the Hemphill service zone and in the Stonewall tank. The scope of work for this project includes The design, permitting and construction of a permanent cost-effective and sustainable solution to the state of the soil-pipe-valve system at the Hartsfield-Jackson International Airport’s pumping station located on South Loop Road, thereby reinforcing the integrity of services for which they were constructed. The work includes, but is not limited to Demolishing existing ductile iron pipe, fittings, and valves Installing new above and below-grade ductile iron pipe, fittings, and valves Installing new flowmeters Constructing reinforced concrete foundation slabs Also included within the scope of this project are structural and architectural modifications to the existing pump station building to facilitate the new above grade piping, landscaping, temporary bypass piping, dewatering, electrical and controls, storm drainage, erosion and sediment control along with all incidentals and appurtenances required for construction.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data