Hartstene Point Sewer System Rehabilitation
Sector: Water Supply and Storage • Location: Shelton, Washington, United States of America
Source: Dodge
The project generally consists of the following: This Contract provides for the construction of approximate-ly 22,250 LF of CIPP pipe lin-ing of 8" and 10" main line sew-ers, open trench replacement of approximately 530 LF of 8" PVC sewer, construction of approxi-mately 26,000 LF of 4" and 6" lateral CIPP lining, installation of approximately 425 sewer later-al cleanouts, rehabilitation of 35 manh
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Commercial, Waste Processing and Treatment
- Location
- Shelton, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Hartstene Point Sewer System Rehabilitation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project generally consists of the following: This Contract provides for the construction of approximate-ly 22,250 LF of CIPP pipe lin-ing of 8" and 10" main line sew-ers, open trench replacement of approximately 530 LF of 8" PVC sewer, construction of approxi-mately 26,000 LF of 4" and 6" lateral CIPP lining, installation of approximately 425 sewer later-al cleanouts, rehabilitation of 35 manholes, construction of approxi-mately 1,470 LI? of 4" HDPE Force Main, a. new 520 GPM sewage lift ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Shelton |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Commercial, Waste Processing and Treatment |
Article published date | 2025-02-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
