Haru Battery Energy Storage System (BESS) Project
Sector: Solar • Location: Free State, South Africa
Source: Energy Capital & Power
The Haru BESS project is a 123 MW/492 MWh battery energy storage system located at the Leander Substation in South Africa. It was awarded under the third Battery Energy Storage Independent Power Producer Procurement Program (BESIPPPP). Scatec is the preferred bidder for this project, which will provide energy, capacity, and ancillary services under a 15-year power purchase agreement.
- Status
- Closed
- Sector
- Solar, Energy Storage, Power Generation (CCGT)
- Location
- Free State, South Africa
- Updated
- 22 Jul 2026
- Source
- Energy Capital & Power
ConstructChat
Ask ConstructChat about Haru Battery Energy Storage System (BESS) Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Company |
Status
Original status | awarded |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Haru BESS project is a 123 MW/492 MWh battery energy storage system located at the Leander Substation in South Africa. It was awarded under the third Battery Energy Storage Independent Power Producer Procurement Program (BESIPPPP). Scatec is the preferred bidder for this project, which will provide energy, capacity, and ancillary services under a 15-year power purchase agreement. |
Original sector | Energy & Power |
Location
Country | South Africa |
State | Free State |
Source
Source | Energy Capital & Power |
URL |
More Details
Record type | Project |
Sector | Solar, Energy Storage, Power Generation (CCGT) |
Article published date | 2025-09-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
