Harvest Hills Wind Project
Sector: Power Generation (CCGT) • Location: Washington, United States
Source: The Spokesman-Review
The Harvest Hills Wind Project plans to install 45 wind turbines near Kamiak Butte, each approximately 600 to 650 feet tall. The project aims to generate 200 megawatts of power and has faced public opposition due to its proximity to a county park and natural landmark. A moratorium has been imposed by Whitman County to update wind energy regulations amid community concerns.
- Status
- Prospective
- Sector
- Power Generation (CCGT), Wind
- Location
- Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- The Spokesman-Review
ConstructChat
Ask ConstructChat about Harvest Hills Wind Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Harvest Hills Wind Project plans to install 45 wind turbines near Kamiak Butte, each approximately 600 to 650 feet tall. The project aims to generate 200 megawatts of power and has faced public opposition due to its proximity to a county park and natural landmark. A moratorium has been imposed by Whitman County to update wind energy regulations amid community concerns. |
Original sector | Energy |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
Source
Source | The Spokesman-Review |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Wind |
Article published date | 2025-02-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States
- EPC of Turbine and Foundation Structure in the Southwest Sea Wind Power Demonstration Complex
- Engineering, Procurement, and Construction of Third Bosphorus Bridge
- Tampa Bay Seawater Desalination Plant
- Carlsbad Desalination Project, San Diego, California
- Joint Base Lewis-McChord
- Fort Benning, Georgia
- Naval Base San Diego, California
- Dover Air Force Base
