Harvest Worship Center Sanctuary & Early Education Center
Sector: Power Generation (CCGT) • Location: Panama City, Florida, United States of America
Source: Dodge USA
Rebuild approx. 10,829-SF Sanctuary with a new 6,810-SF 1st level addition for Early Education with another 3,630-SF 2nd level Administration area - Trades include: Site Concrete, Concrete, Structural Steel Erection, Rough Carpentry, Finish Carpentry, Casework, Light-Gauge Metal Framing, Drywall, Acoustical Ceilings, Batt Insulation at Interior Walls, Caulking/Waterproofing, Doors & Windows, Floor
- Status
- Closed
- Sector
- Power Generation (CCGT), Commercial, Education, Steel, Metal, Cement, Manufacturing (Industrial)
- Location
- Panama City, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Harvest Worship Center Sanctuary & Early Education Center
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Rebuild approx. 10,829-SF Sanctuary with a new 6,810-SF 1st level addition for Early Education with another 3,630-SF 2nd level Administration area - Trades include: Site Concrete, Concrete, Structural Steel Erection, Rough Carpentry, Finish Carpentry, Casework, Light-Gauge Metal Framing, Drywall, Acoustical Ceilings, Batt Insulation at Interior Walls, Caulking/Waterproofing, Doors & Windows, Flooring, Painting, Specialties, HVAC, Plumbing, Fire Sprinkler, Fire Alarm, Electrical & Lighting. (E... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Panama City |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Commercial, Education, Steel, Metal, Cement, Manufacturing (Industrial) |
Article published date | 2024-10-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Shop 1 Building Replacement
- North Creek Trail Section 4-Phase 2 & 3
