Harvey Lock Forebay Floodwall
Sector: Car parking • Location: Harvey, Louisiana, United States of America
Source: Dodge USA
The MRL Harvey Lock Forebay Levee Enlargement project is designed to address an approximately 265 ft reach of the MRL located on the right descending bank opposite river mile 98.3, in Harvey, Louisiana. Presently, this section of the MRL is deficient of the required design grade by an average of 3 feet (1m). The work consists of raising the current elevation of levee with pile-founded concrete T-w
- Status
- Closed
- Sector
- Car parking, Commercial, Cement, Automotive, Manufacturing (Industrial)
- Location
- Harvey, Louisiana, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Harvey Lock Forebay Floodwall
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The MRL Harvey Lock Forebay Levee Enlargement project is designed to address an approximately 265 ft reach of the MRL located on the right descending bank opposite river mile 98.3, in Harvey, Louisiana. Presently, this section of the MRL is deficient of the required design grade by an average of 3 feet (1m). The work consists of raising the current elevation of levee with pile-founded concrete T-wall. The new T-wall will begin on one end just south of the existing Riverfront Park and will sto... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Louisiana |
City | Harvey |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Car parking, Commercial, Cement, Automotive, Manufacturing (Industrial) |
Article published date | 2024-09-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- FRANKLIN CO. AIRPORT DRIVES & PARKING
- SR 7 FROM FLORIDA STATE LINE TO NSR
- SIMPSON STREET/JONES AVE FM NORTHSIDE DR TO LUCKIE ST- GRTA
- CULVERT & BRIDGE CULVERT DURHAM PARK ROAD
- SR 9 @ CR 3705/AC SMITH RD
- CR 478/MOULTRIE LENOX RD @ LITTLE RVR 9 MI E OF NORMAN PARK
- I-285 FM I-75/CLAYTON THRU FULTON TO I-20/DEKALB
- LINCOLNTON DOWNTOWN STREETSCAPE - PHASE II
