logo

Harvey Solar Project

Sector: Solar • Location: Harvey, Ohio, United States

Source: PV Tech

Project
Planned

The Harvey solar project is a 350MW solar facility in late development stages in Licking County, Ohio. Leeward Renewable Energy acquired the project and plans to start construction in Q3 2026 with commercial operations targeted for late 2028.

Status
Prospective
Sector
Solar, Power Generation (CCGT), Commercial
Location
Harvey, Ohio, United States of America
Updated
22 Jul 2026
Source
PV Tech

ConstructChat

Ask ConstructChat about Harvey Solar Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Harvey Solar Project” is an infrastructure initiative in the Solar sector, located in Harvey, Ohio, United States. Taiyo aggregates data on it from PV Tech.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Harvey solar project is a 350MW solar facility in late development stages in Licking County, Ohio. Leeward Renewable Energy acquired the project and plans to start construction in Q3 2026 with commercial operations targeted for late 2028.

Original sector

Power Plants

Location

Country

United States of America (USA)

State

Ohio

City

Harvey

Source

Source

PV Tech

URL

More Details

Record type

Project

Sector

Solar, Power Generation (CCGT), Commercial

Article published date

2026-03-28

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project