Harvey Tunnel
Sector: Road • Location: Harvey, Louisiana, United States
Source: NOLA
The Harvey Tunnel was the first underwater roadway authorized in Louisiana, built between 1954 and 1957 at a cost of $5 million. It was closed temporarily in December 2023 for a $53.7 million overhaul. The tunnel contributed to population growth and increased property values in the area.
- Status
- Under Construction
- Sector
- Road, Water Supply and Storage, Tunnel
- Location
- Harvey, Louisiana, United States of America
- Updated
- 22 Jul 2026
- Source
- NOLA
ConstructChat
Ask ConstructChat about Harvey Tunnel
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under overhaul |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Harvey Tunnel was the first underwater roadway authorized in Louisiana, built between 1954 and 1957 at a cost of $5 million. It was closed temporarily in December 2023 for a $53.7 million overhaul. The tunnel contributed to population growth and increased property values in the area. |
Original sector | Transportation |
Budget |
Location
Country | United States of America (USA) |
State | Louisiana |
City | Harvey |
Source
Source | NOLA |
URL |
More Details
Record type | Project |
Sector | Road, Water Supply and Storage, Tunnel |
Article published date | 2025-09-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
