logo
ProjectClosed

HARYANA POWER SYSTEM IMPROVEMENT PROJECT

Sector: Power Transmission • Location: India

Source: World Bank

The objective of the Haryana Power System Improvement Project for India is to improve the availability, efficiency, and accountability of electricity supply in the state of Haryana through strengthening the transmission and distribution systems. There are three components to the project, the first component being transmission system strengthening. This component includes priority investments in 40

Status
Closed
Sector
Power Transmission, Manufacturing (Industrial), Power Generation (CCGT), Government, Commercial
Location
India
Updated
22 Jul 2026
Source
World Bank

ConstructChat

Ask ConstructChat about HARYANA POWER SYSTEM IMPROVEMENT PROJECT

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “HARYANA POWER SYSTEM IMPROVEMENT PROJECT” is an infrastructure initiative in the Power Transmission sector, located in India. Taiyo aggregates data on it from World Bank.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The objective of the Haryana Power System Improvement Project for India is to improve the availability, efficiency, and accountability of electricity supply in the state of Haryana through strengthening the transmission and distribution systems. There are three components to the project, the first component being transmission system strengthening. This component includes priority investments in 400 kV, 220 kV, 132 kV and 66 kV sub-stations together with transmission lines for system augmentation. The specific investments have been identified based on system load flow study carried out by Haryana Vidyut Prasaran Nigam Limited (HVPN) which analyzes growth in load and future generation expansion over a defined time period. The second component is the urban distribution system strengthening. This component will be implemented for each town through turnkey Supply and Installation (S&I) contracts which will typically include the following sub-components: (i) conversion of feeder network to High Voltage Distribution System (HVDS) (to reduce technical and commercial losses); and (ii) segregation of industrial feeders (to improve supply quality and accountability). Finally, the third component is the technical assistance and capacity building of transmission and distribution companies. Substantial Technical Assistance (TA) is required for effective implementation of the project and to support institutional development, capacity building, and governance improvement.

Original sector

FY17 - Energy and Extractives

Budget

Location

Country

India

Source

Source

World Bank

URL

More Details

Record type

Project

Sector

Power Transmission, Manufacturing (Industrial), Power Generation (CCGT), Government, Commercial

Article published date

2025-12-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project