HARYANA POWER SYSTEM IMPROVEMENT PROJECT
Sector: Power Transmission • Location: India
Source: World Bank Group
The objective of the Haryana Power System Improvement Project for India is to improve the availability, efficiency, and accountability of electricity supply in the state of Haryana through strengthening the transmission and distribution systems. There are three components to the project, the first component being transmission system strengthening. This component includes priority investments in 40
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The objective of the Haryana Power System Improvement Project for India is to improve the availability, efficiency, and accountability of electricity supply in the state of Haryana through strengthening the transmission and distribution systems. There are three components to the project, the first component being transmission system strengthening. This component includes priority investments in 400 kV, 220 kV, 132 kV and 66 kV sub-stations together with transmission lines for system augmentation. The specific investments have been identified based on system load flow study carried out by Haryana Vidyut Prasaran Nigam Limited (HVPN) which analyzes growth in load and future generation expansion over a defined time period. The second component is the urban distribution system strengthening. This component will be implemented for each town through turnkey Supply and Installation (S&I) contracts which will typically include the following sub-components: (i) conversion of feeder network to High Voltage Distribution System (HVDS) (to reduce technical and commercial losses); and (ii) segregation of industrial feeders (to improve supply quality and accountability). Finally, the third component is the technical assistance and capacity building of transmission and distribution companies. Substantial Technical Assistance (TA) is required for effective implementation of the project and to support institutional development, capacity building, and governance improvement. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Power Transmission projects in India
- Sugen 1100MW CCGT Akhakhol Gujarat
- Tuppadahalli Wind Farm
- Salaya Power Project Gujarat
- West Pharmaceutical Services Pharmaceutical Packaging Plant, Sri City, Andhra Pradesh
- 765 kV D/C Hyderabad-Wardha Transmission Line
- 7.52 MWp Rooftop Solar Plant, Amritsar, Punjab
- India’s first ever successfully commissioned STATCOM at NP Kunta
- Udaipur Smart City Project
