logo

HARYANA POWER SYSTEM IMPROVEMENT PROJECT

Sector: Power Transmission • Location: India

Source: World Bank Group

Project
Closed

The objective of the Haryana Power System Improvement Project for India is to improve the availability, efficiency, and accountability of electricity supply in the state of Haryana through strengthening the transmission and distribution systems. There are three components to the project, the first component being transmission system strengthening. This component includes priority investments in 40

Project Information FAQ

Project Information

5 Q
The project “HARYANA POWER SYSTEM IMPROVEMENT PROJECT” is an infrastructure initiative in the Power Transmission sector, located in India. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The objective of the Haryana Power System Improvement Project for India is to improve the availability, efficiency, and accountability of electricity supply in the state of Haryana through strengthening the transmission and distribution systems. There are three components to the project, the first component being transmission system strengthening. This component includes priority investments in 400 kV, 220 kV, 132 kV and 66 kV sub-stations together with transmission lines for system augmentation. The specific investments have been identified based on system load flow study carried out by Haryana Vidyut Prasaran Nigam Limited (HVPN) which analyzes growth in load and future generation expansion over a defined time period. The second component is the urban distribution system strengthening. This component will be implemented for each town through turnkey Supply and Installation (S&I) contracts which will typically include the following sub-components: (i) conversion of feeder network to High Voltage Distribution System (HVDS) (to reduce technical and commercial losses); and (ii) segregation of industrial feeders (to improve supply quality and accountability). Finally, the third component is the technical assistance and capacity building of transmission and distribution companies. Substantial Technical Assistance (TA) is required for effective implementation of the project and to support institutional development, capacity building, and governance improvement.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data