Hassi R’mel Solar/CCNG Plant

Sector: Solar • Location: Algeria

Source: World Bank Group

Project
Active

New Energy Algeria (NEAL) (20%), a consortium of state-owned Sonatrach and state-owned Sonelgaz with private SIM, together with Spanish Abener Energia SA (51%)(subsidiary of ABENGOA biofuel and solar thermal company (ABG.MA), in turn managed by ABEINSA) and COFIDES (15%) was planning the development of the 150MW Hassi R'mel power plant, combining 125MW CCNG with 25MW CSP. The project was located n

Project Information FAQ

Project Information

4 Q
The project “Hassi R’mel Solar/CCNG Plant” is an infrastructure initiative in the Solar sector, located in Algeria. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

New Energy Algeria (NEAL) (20%), a consortium of state-owned Sonatrach and state-owned Sonelgaz with private SIM, together with Spanish Abener Energia SA (51%)(subsidiary of ABENGOA biofuel and solar thermal company (ABG.MA), in turn managed by ABEINSA) and COFIDES (15%) was planning the development of the 150MW Hassi R'mel power plant, combining 125MW CCNG with 25MW CSP. The project was located near Hassi R'mel. The output of the solar plant was to be used in the steam element of the CCNG plant. The project company, a joint venture between NEAL and Abener, was named Solar Power Plant One (SPP1). Reportedly, Sonatrach held an additional 14% equity besides its participation in NEAL. The EPC contract was signed in January 2007 and was commissioned in June 2011. The output was to be sold to Sonatrach for 3.13 DA/KWh ($0.04/KWh). Construction period was expected to last for 33 months. The project life cycle was expected to be 25 years. Total cost was $350 million, of which 80% ($280 million) was funded by debt from BEA, Popular Credit (CPA) and National Bank Algeria (BNA). The project also expected to apply for UNFCCC CDM financing. http://www.cofides.es/english/5africastory_1.html http://www.neal-dz.net/index.php?lang=en http://portail.cder.dz/spip.php?article1456 http://www.powerengineeringint.com/articles/print/volume-19/issue-11/features/isccs-outlook-brightens-with-wave-of-projects.html http://www.neal-dz.net/index.php?option=com_content&view=article&id=275&Itemid=124&lang=en

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data