Hassyan SWRO Phase 2 Water Transmission Pipelines
Sector: Waste Processing and Treatment • Location: Dubai, United Arab Emirates
Source: Smart Water Magazine
The project involves the supply, installation, testing, and commissioning of glass-reinforced epoxy (GRE) pipelines and related infrastructure for Phase 2 of the Hassyan Seawater Reverse Osmosis (SWRO) desalination plant. Phase 2 will add 60 million imperial gallons per day (MIGD) to the plant's capacity, bringing the total to 240 MIGD.
- Status
- Prospective
- Sector
- Waste Processing and Treatment, Power Generation (CCGT), Water Supply and Storage
- Location
- Dubai, United Arab Emirates
- Updated
- 22 Jul 2026
- Source
- Smart Water Magazine
ConstructChat
Ask ConstructChat about Hassyan SWRO Phase 2 Water Transmission Pipelines
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project involves the supply, installation, testing, and commissioning of glass-reinforced epoxy (GRE) pipelines and related infrastructure for Phase 2 of the Hassyan Seawater Reverse Osmosis (SWRO) desalination plant. Phase 2 will add 60 million imperial gallons per day (MIGD) to the plant's capacity, bringing the total to 240 MIGD. |
Original sector | Water |
Budget |
Location
Country | United Arab Emirates (UAE) |
State | Dubai |
City | Dubai |
Source
Source | Smart Water Magazine |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Power Generation (CCGT), Water Supply and Storage |
Article published date | 2026-05-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United Arab Emirates
- Al Layyah CombinedCycle Power Plant Sharjah UAE
- Taweelah A1 Power and Desalination Plant Abu Dhabi
- 375 MLD Jebel Ali Sewage Treatment Plant
- Ruwais Refinery Expansion
- Mirfa IWPP
- Hamriyah Desalination Power Plant Phase II
- Hamriyah Desalination Power Plant Phase I
- Jebel Ali M Power Station Desalination Expansion
