Hastie Lane Culvert Replacement
Sector: Water Supply and Storage • Location: Exeter Township, Pennsylvania, United States of America
Source: Dodge USA
The project consists of the following items: Base Bid: Replacement of a Corrugated Metal Pipe with a Precast Concrete Culvert, and all work incident thereto, Roadway Excavation, 400 C.Y., 140 S.Y. of 2A Subbase, 2,350 S.Y. of Superpave Base Course, 25 mm, 2,350 S.Y. of Superpave Wearing Course, 9.5 mm, 230 L.F. of Guiderail, Bypass Pumping, Stream Diversion/Coffer Dam, Erosion and Sedimentation Co
- Status
- Closed
- Sector
- Water Supply and Storage, Mass Transit, Commercial, Road, Rail, Hydro, Metal, Cement, Government, Waste Processing and Treatment
- Location
- Exeter Township, Pennsylvania, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Hastie Lane Culvert Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project consists of the following items: Base Bid: Replacement of a Corrugated Metal Pipe with a Precast Concrete Culvert, and all work incident thereto, Roadway Excavation, 400 C.Y., 140 S.Y. of 2A Subbase, 2,350 S.Y. of Superpave Base Course, 25 mm, 2,350 S.Y. of Superpave Wearing Course, 9.5 mm, 230 L.F. of Guiderail, Bypass Pumping, Stream Diversion/Coffer Dam, Erosion and Sedimentation Controls, and Site Restoration. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Pennsylvania |
City | Exeter Township |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Mass Transit, Commercial, Road, Rail, Hydro, Metal, Cement, Government, Waste Processing and Treatment |
Article published date | 2024-09-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
