Hastings WTP Expansion - ARPA
Sector: Power Generation (CCGT) • Location: Hastings, Florida, United States of America
Source: Dodge USA
The purpose of the project is to provide water treatment plant improvements including one (1) new reverse osmosis treatment train housed in a new pre-engineered metal building, one (1) new high service pump station, one (1) new backup generator and fuel tank, electrical upgrades, and associated yard piping and appurtenances. The County is seeking to install a new Degasifier and Hypochlorite Buildi
- Status
- Closed
- Sector
- Power Generation (CCGT), Metal, Rail, Government, Water Supply and Storage, Waste Processing and Treatment, Commercial
- Location
- Hastings, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Hastings WTP Expansion - ARPA
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The purpose of the project is to provide water treatment plant improvements including one (1) new reverse osmosis treatment train housed in a new pre-engineered metal building, one (1) new high service pump station, one (1) new backup generator and fuel tank, electrical upgrades, and associated yard piping and appurtenances. The County is seeking to install a new Degasifier and Hypochlorite Building and Metering Station that is being considered as Bid Alternate #1 and Bid Alternate #2. The pr... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Hastings |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Metal, Rail, Government, Water Supply and Storage, Waste Processing and Treatment, Commercial |
Article published date | 2024-10-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Shop 1 Building Replacement
- North Creek Trail Section 4-Phase 2 & 3
