Hat Creek Road Culvert Replacement
Start · British Columbia · Last reported Jun 2020
Source: Dodge USA
Install 2400 mm Corrugated Steel Pipe (CSP) Culvert, roadway and drainage construction, clearing and grubbing, drainage excavation and fencing.
- Status
- Under Construction
- Sector
- Commercial, Water Supply and Storage, Road, Steel, Waste Processing and Treatment, Metal
- Location
- Cache Creek, British Columbia, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Hat Creek Road Culvert Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Start |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Install 2400 mm Corrugated Steel Pipe (CSP) Culvert, roadway and drainage construction, clearing and grubbing, drainage excavation and fencing. |
Procurement method |
Location
Country | Canada |
State | British Columbia |
City | Cache Creek |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Water Supply and Storage, Road, Steel, Waste Processing and Treatment, Metal |
Article published date | 2024-02-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in Canada
- Site C Worker Accommodation
- Transport and Rescue Squadron Hangar Facility - 19 Wing CFB Comox 442
- Thornwood Residences Phase 2
- Canadian Tire Corporate Office Interior Renovation
- St. Stephen Border Crossing
- Aqsarniit Hotel and Convention Centre
- Safeway Refrigerated Warehouse
- International Brotherhood of Boilermakers Training Centre and Union Hall
