logo

Hatch Road Water Transmission Main Phase 3

Sector: Water Supply and Storage • Location: Ceres, California, United States of America

Source: Dodge

Project
Closed

for the work shown on the plans entitled: PROJECT NUMBER 2525-3 HATCH ROAD 18 WATER TRANSMISSION LINE PHASE 3 will be received at the Office of the City Engineer of the City of Ceres, 2220 Magnolia Street Ceres, California, until 2:00 PM on AUGUST 28, 2025, at which time they will be publicly opened, read, and recorded. N-2 DESCRIPTION OF THE WORK: The work to be performed includes, but is not lim

Status
Closed
Sector
Water Supply and Storage, Government, Road, Residential, Commercial
Location
Ceres, California, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Hatch Road Water Transmission Main Phase 3

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Hatch Road Water Transmission Main Phase 3” is an infrastructure initiative in the Water Supply and Storage sector, located in Ceres, California, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

for the work shown on the plans entitled: PROJECT NUMBER 2525-3 HATCH ROAD 18 WATER TRANSMISSION LINE PHASE 3 will be received at the Office of the City Engineer of the City of Ceres, 2220 Magnolia Street Ceres, California, until 2:00 PM on AUGUST 28, 2025, at which time they will be publicly opened, read, and recorded. N-2 DESCRIPTION OF THE WORK: The work to be performed includes, but is not limited to, installation of water transmission main by open-cut methods.

Procurement method

Budget

Location

Country

United States of America (USA)

State

California

City

Ceres

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Government, Road, Residential, Commercial

Article published date

2025-09-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project