logo

Haus 2+ / Office ParkScheerbarth

Sector: Forest Products and Packaging • Location: Germany

Source: ArchDaily

Project
Closed

A tight budget and a small footprint required maximum space and resource efficiency. Therefore, architects Moojin Park and Ben Scheerbarth used what was available on site: Like a “friendly parasite,” Haus 2+ shares the exterior stairwell of the neighboring concert hall, eliminating the need for its own CO2-intensive space for circulation. It uses an existing basement as a floor slab and the distri

Project Information FAQ

Project Information

3 Q
The project “Haus 2+ / Office ParkScheerbarth” is an infrastructure initiative in the Forest Products and Packaging sector, located in Germany. Taiyo aggregates data on it from ArchDaily.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

A tight budget and a small footprint required maximum space and resource efficiency. Therefore, architects Moojin Park and Ben Scheerbarth used what was available on site: Like a “friendly parasite,” Haus 2+ shares the exterior stairwell of the neighboring concert hall, eliminating the need for its own CO2-intensive space for circulation. It uses an existing basement as a floor slab and the district heating station inside as the main energy source. Its roof terrace integrates with Holzmarkt’s sequence of open arcades, bridges, and balconies.Haus 2+ combines three timber construction systems. Internal walls are from mass timber, slabs from timber box elements, and exterior walls from timber frames, all clad with a timber façade. Regionally prefabricated and screwed instead of glued, all components can be disassembled, segregated, and reused with little effort. In keeping with the cradle-to-cradle principle, the Haus 2+ echoes Holzmarkt’s roots – a trading port for wood.Text description provided by the architects.Until the early 19th century, the Holzmarkt area on the river Spree was a central lumber port forBerlin. It later became a border zone of the GDR, a vacant brownfield after reunification, and from 2003, home to the legendary techno club Bar25. In 2012, this gave rise to “Holzmarkt 25”, a cooperative cultural quarter with a concert hall, a club, recording studios, restaurants, and many small kiosks and huts serving the public waterfront and drawing around 500,000 visitors every year.With the new Haus 2+, the first all-timber building enters the stage: its progressive design and P commitment to sustainability set a clear statement amidst this seemingly improvised patchwork of buildings. Fully clad in bright red wood, the three-storied addition marks the main entrance to the area. Its complex and curvy shape is composed of simple geometric volumes that offer individual room layouts for its diverse tenants – the 200 square meters are shared by a bakery and a tattoo studio, a booking agency and an artist, a photo studio, and a physiotherapist.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data