Havieron Gold-Copper Mine Development
Sector: Metal • Location: Western Australia, Australia
Source: Proactive financial news
The project involves developing the Havieron gold-copper mine in Western Australia as a long-life, low-cost operation. The feasibility study outlines a 17-year mine plan with average annual production of 266,000 ounces of gold and 9,600 tonnes of copper, utilizing existing infrastructure at the nearby Telfer site. The project aims for lowest quartile cost operation with pre-production capital expe
- Status
- Prospective
- Sector
- Metal
- Location
- Western Australia, Australia
- Updated
- 22 Jul 2026
- Source
- Proactive financial news
ConstructChat
Ask ConstructChat about Havieron Gold-Copper Mine Development
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project involves developing the Havieron gold-copper mine in Western Australia as a long-life, low-cost operation. The feasibility study outlines a 17-year mine plan with average annual production of 266,000 ounces of gold and 9,600 tonnes of copper, utilizing existing infrastructure at the nearby Telfer site. The project aims for lowest quartile cost operation with pre-production capital expenditure estimated at US$1,065 million. |
Original sector | Mining |
Budget |
Location
Country | Australia |
State | Western Australia |
Source
Source | Proactive financial news |
URL |
More Details
Record type | Project |
Sector | Metal |
Article published date | 2025-12-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
