HAWE Office Building / Barkow Leibinger
One of 10,000+ projects Taiyo tracks in Germany.
Source: ArchDaily
The extension marks the office building even more clearly as a representative area and introduction to the expansive ensemble of production halls. The new building is attached to the existing building, which required some architectural interventions there as well. In the spirit of sustainability, the existing front wall was detached and reused, and the extensive green roof was also expanded.The ex
- Status
- Closed
- Sector
- Steel, Cement, Metal, Manufacturing (Industrial), Residential, Commercial
- Location
- Germany
- Updated
- 22 Jul 2026
- Source
- ArchDaily
ConstructChat
Ask ConstructChat about HAWE Office Building / Barkow Leibinger
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The extension marks the office building even more clearly as a representative area and introduction to the expansive ensemble of production halls. The new building is attached to the existing building, which required some architectural interventions there as well. In the spirit of sustainability, the existing front wall was detached and reused, and the extensive green roof was also expanded.The existing factory halls are designed with possible future expansion in mind. Up to now, however, changes in use and a compacted placement of machinery were possible within the existing structure, designed for robustness and maximal flexibility, and it was possible to carry the technical systems forward within the open concrete construction.The aluminum post and mullion façade with its extensive openings allows for a high degree of transparency and permeability in the interior spaces, and together with the glass walls continues the main feature of the existing building. External sun protection and ventilation flaps that can be opened manually ensure a comfortable working environment. The office spaces that can be used quite flexibly allow for different forms of working: from communicative open spaces to concentrated individual work or a private conversation in a phone box.Text description provided by the architects.After the opening of the HAWE plant inKaufbeurenin 2014, the first expansion was completed at the beginning of 2021: an extension of the front building by an additional 1,000 square meters providing space for 70 employees at the company, which specialized in hydraulic systems. The new building, completed after just one year of planning and construction, houses staff from the areas of marketing, development, and experimentation who had previously worked at a site in Altenstadt, which is now closed. |
Location
Country | Germany |
Source
Source | ArchDaily |
URL |
More Details
Record type | Project |
Sector | Steel, Cement, Metal, Manufacturing (Industrial), Residential, Commercial |
Article published date | 2025-06-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
