The state highways that are incorporated include State Highway 2B (SH2B), State Highway 50 (SH50) and State Highway 50A (SH50A). Hawke's Bay Expressway in New Zealand connects Flaxmere, west of Hastings, and Napier Airport. The project work will be carried out between Hastings City and Flaxmere. The construction cost of the extension is estimated to be NZD$14m. The project was conceived in 200

Project Information FAQ

Project Information

3 Q
The project “Hawke’s Bay Expressway Southern Extension” is an infrastructure initiative in the Airport sector, located in New Zealand. Taiyo aggregates data on it from Road Traffic Technology.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The state highways that are incorporated include State Highway 2B (SH2B), State Highway 50 (SH50) and State Highway 50A (SH50A). Hawke's Bay Expressway in New Zealand connects Flaxmere, west of Hastings, and Napier Airport. The project work will be carried out between Hastings City and Flaxmere. The construction cost of the extension is estimated to be NZD$14m. The project was conceived in 2007 and is intended to reduce traffic congestion and the number of accidents. Hawke’s Bay Expressway in New Zealand connects Flaxmere, west of Hastings, and Napier Airport. Flaxmere and Napier Airport are connected through Taradale, a town in the Hawke’s Bay region. The expressway is a single-lane route with roundabouts at Prebensen Drive, Taradale Road, Evenden Road, Omahu Road and Flaxmere Avenue / York Road. It has interchanges at Kennedy Road and Meeanee Road. The state highways that are incorporated include State Highway 2B (SH2B), State Highway 50 (SH50) and State Highway 50A (SH50A). The first section of the expressway opened in the early 1960s. Construction work on the second section started in the 1990s. In 2003 the new bridge (expressway) to Hawke’s Bay Airport was opened. The Hawke’s Bay Expressway Southern Extension (HESE) project involved the extension of SH50A by 3.2km. The project, conceived in 2007, was intended to reduce traffic congestion and the number of accidents. Extension work started in October 2009 and was completed in March 2011. Previously, the existing expressway terminated at an upgraded “four-legged” roundabout, while the new extension started at the same point. The extension was carried out southwards to a new “five legged” roundabout. HESE project extended the last section of the Hawke’s Bay Expressway. The project work was carried out between Hastings City and Flaxmere. The extension project provided a direct route between the roundabouts on York Road and Longlands Road. The project reduced travel times for commuters. It removed the bottlenecks and crash blackspot at the York Road / Maraekakaho Road T-intersection and supported the future growth of transportation and infrastructure in the region. Safety was made a priority, as the expressway is the main route through the region. The southern extension project enhances the safety of the expressway through an uninterrupted link. To achieve this, no connections have been provided between the expressway and local roads and no private access road. The extension work included construction of 3.2km road through greenfield areas and realignment of a portion of Maraekakaho Road to connect the expressway and Longlands Road. The project also involved the removal of the T-intersection to reduce congestion. The project was carried out over two years. During the first year, work took place in the greenfields area. During the second year connections to existing roads at both ends of the expressway were built and work was carried out at the York Road intersection. During the second year of construction the three-legged roundabout at the York Road intersection was converted into a four-legged roundabout. The extension project has also divided Irongate Road into two equal roads, one on each side of the expressway. These two roads are accessible through Stock Road and Maraekakaho Road. The project required an investment of NZD$12m. New Zealand Transport Agency Board provided about NZ$12m from regional funds. The regional distributed funds were approved by Hawke’s Bay Regional Land Transport Committee.. Opus International Consultants was awarded a contract to undertake the design and construction management of the southern section extension project. Construction was carried out by Higgins Contractors. Most of the contractors and sub-contractors of the project were regionally based.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data