logo

Hawkeye Solar 200 MW

Sector: Solar • Location: Grand Mound, Iowa, United States of America

Source: Dodge

Project
Design Development

Proposed 200 MW alternating current photovoltaic (PV) solar energy facility located in Clinton County. The proposed project will be located on approximately 1,200 acres of agricultural land located within an 1,817-acre project site

Status
Prospective
Sector
Solar, Raw Materials, Power Generation (CCGT), Commercial
Location
Grand Mound, Iowa, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Hawkeye Solar 200 MW

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Hawkeye Solar 200 MW” is an infrastructure initiative in the Solar sector, located in Grand Mound, Iowa, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

design development

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Proposed 200 MW alternating current photovoltaic (PV) solar energy facility located in Clinton County. The proposed project will be located on approximately 1,200 acres of agricultural land located within an 1,817-acre project site

Budget

Location

Country

United States of America (USA)

State

Iowa

City

Grand Mound

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Solar, Raw Materials, Power Generation (CCGT), Commercial

Article published date

2025-07-28

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project