Hawks Road Culvert Replacement
Sector: Water Supply and Storage • Location: Pittsfield, New York, United States of America
Source: Dodge
Remove and replace the existing Hawks Road culvert and reconstruct approximately 200 feet of approach roadway to tie the structure into the adjacent highway. Replacement of Hawks Road Culvert over Unnamed Tributary
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Commercial, Waste Processing and Treatment, Road
- Location
- Pittsfield, New York, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Hawks Road Culvert Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Remove and replace the existing Hawks Road culvert and reconstruct approximately 200 feet of approach roadway to tie the structure into the adjacent highway. Replacement of Hawks Road Culvert over Unnamed Tributary |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New York |
City | Pittsfield |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Commercial, Waste Processing and Treatment, Road |
Article published date | 2025-03-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
