Hay Road Improvement
One of 10,000+ projects Taiyo tracks in California.
Source: Dodge USA
General work description: Edge widening, cold planing, and 3" thick 3/4"-HMA overlay with geosynthetic interlayer on Hay Road from Burke Lane to State Route 113. The work also includes construction of a HMA driveway, roadside ditches, shoulder backing, striping, adjusting facilities to grade, and signage.
- Status
- Prospective
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Commercial, Road, Mass Transit, Government, Rail
- Location
- Fairfield, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Hay Road Improvement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | General work description: Edge widening, cold planing, and 3" thick 3/4"-HMA overlay with geosynthetic interlayer on Hay Road from Burke Lane to State Route 113. The work also includes construction of a HMA driveway, roadside ditches, shoulder backing, striping, adjusting facilities to grade, and signage. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Fairfield |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Commercial, Road, Mass Transit, Government, Rail |
Article published date | 2024-08-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
