logo

Hayden Ferry Lakeside Garage Expansion

Sector: Car parking • Location: Tempe, Arizona, United States

Source: McCarthy Building Companies

Project
Completed

McCarthy added a top floor to the existing 10-level parking building at Hayden Ferry Lakeside in Tempe, Arizona. The 75,700-square-foot expansion was completed in eight months and provided an additional 252 spaces for the facility. McCarthy self-performed the concrete and mechanical scope, utilizing floors 7 and 8 to construct the deck panels and Cunningham beam system. The onsite staging was limi

Project Information FAQ

Project Information

4 Q
The project “Hayden Ferry Lakeside Garage Expansion” is an infrastructure initiative in the Car parking sector, located in Tempe, Arizona, United States. Taiyo aggregates data on it from McCarthy Building Companies.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

McCarthy added a top floor to the existing 10-level parking building at Hayden Ferry Lakeside in Tempe, Arizona. The 75,700-square-foot expansion was completed in eight months and provided an additional 252 spaces for the facility. McCarthy self-performed the concrete and mechanical scope, utilizing floors 7 and 8 to construct the deck panels and Cunningham beam system. The onsite staging was limited to 15,000 square feet within the campus footprint. Due to the heavy onsite vehicular and pedestrian traffic, the team took every precaution to ensure safety was a number one priority. Measures included installing canopy scaffolding around the parking building at a 30-degree angle, as well as debris netting to catch anything additional that may have been dropped from the structure. Fencing was also utilized around the building to direct patrons to protected walking paths. A unique attribute was that the columns were custom sizes and varied from 24”x24” causing them to be reinforced before they could be increased in height. Existing conditions required additional solutions to minimize the impact on budget and costs.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data