Hayes Street Waterline Replacement
Sector: Water Supply and Storage • Location: Shawnee, Oklahoma, United States of America
Source: Dodge USA
The following description, while not intended to cover all details, outlines some items of the work to be accomplished under this Contract: 1. Replace approximately 1,772 LF of 8" HDPE waterline through trenching and boring. 2. Replace approximately 17 LF of 24" HDPE waterline by trenching. 3. Remove and replace asphalt and concrete pavement and gravel driveways as necessary. Note: The waterline m
- Status
- Prospective
- Sector
- Water Supply and Storage, Government, Cement, Commercial, Road, Waste Processing and Treatment
- Location
- Shawnee, Oklahoma, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Hayes Street Waterline Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The following description, while not intended to cover all details, outlines some items of the work to be accomplished under this Contract: 1. Replace approximately 1,772 LF of 8" HDPE waterline through trenching and boring. 2. Replace approximately 17 LF of 24" HDPE waterline by trenching. 3. Remove and replace asphalt and concrete pavement and gravel driveways as necessary. Note: The waterline must stay in operation throughout construction. Temporary pumping, piping, plugs, shut offs, etc. ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Oklahoma |
City | Shawnee |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Cement, Commercial, Road, Waste Processing and Treatment |
Article published date | 2024-11-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
