Hazel Green Well Improvements
Sector: Road • Location: Hazel Green, Alabama, United States of America
Source: Dodge USA
Improvements to the existing Hazel Green Well. In general, the proposed improvements include: Demolition of an existing, outdoor concrete slab that has settled. Construction of a concrete slab and grade beams in the same location for the electrical equipment. Installation of a new aluminum canopy for electrical equipment. Re-routing and extending the existing caustic tank fill line. New fencing an
- Status
- Closed
- Sector
- Road, Government, Metal, Commercial, Power Generation (CCGT), Waste Processing and Treatment, Water Supply and Storage, Steel, Cement
- Location
- Hazel Green, Alabama, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Hazel Green Well Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Improvements to the existing Hazel Green Well. In general, the proposed improvements include: Demolition of an existing, outdoor concrete slab that has settled. Construction of a concrete slab and grade beams in the same location for the electrical equipment. Installation of a new aluminum canopy for electrical equipment. Re-routing and extending the existing caustic tank fill line. New fencing and gates. Demolishing obsolete power service and obsolete electrical systems. Providing a new powe... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Alabama |
City | Hazel Green |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Road, Government, Metal, Commercial, Power Generation (CCGT), Waste Processing and Treatment, Water Supply and Storage, Steel, Cement |
Article published date | 2024-09-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in United States of America
- CARTER TOWN ROAD
- DUDLEY-STATE ROUTE 29 ROAD
- CR 299/CCC CAMP ROAD @ EMERY CREEK 6.5 MI SE OF CRANDALL
- SR 202 FROM THOMAS COUNTY LINE TO SR 111
- I-285 @ CR 220/CLARK HOWELL ROAD - REHAB BOX BEAMS
- SIX STREETS IN FAYETTEVILLE
- SR 49 @ SWEETWATER CRK & VINEY CRK 1 MI S OF ANDERSONVILLE
- CS 600/S CHURCH STREET FROM SR 30 TO W PINE STREET - TIA
